Feasibility review
Check sample condition, drawings, material, interfaces and expected order use.
Tooling project
Tooling begins only after the reference part, functional interfaces and acceptance method are clear enough to control the trial sample.

Customization details
Reverse engineering from a worn sample can transfer errors into the tool. We identify wear, deformation and missing information, agree the critical dimensions, and define how the first trial parts will be measured and fitted.
OEM / ODM
Check sample condition, drawings, material, interfaces and expected order use.
Freeze critical dimensions, parting considerations and sample acceptance points.
Measure and fit the trial part, record deviations and approve required corrections.
FAQ
It may start the review, but wear and deformation must be identified and missing dimensions confirmed.
Technical checks are recorded by the supply team, while the buyer approves application-specific fit and requirements.
No. The tool is controlled against the agreed reference and application; other applications require separate verification.
OEM / ODM
Logo marking is assessed against the part material, available surface and intended use before a production method is proposed.
View details02Packaging is designed around product protection, warehouse identification and the information required by the destination market.
View details03A requested change is first separated into fitment, material, performance and packing requirements so each item can be verified.
View details